Multi-Objective Optimization of Rail Construction Project Management Using Immune Genetic Algorithms for Schedule, Cost, and Quality Trade-offs

Abstract

We address railway construction project management as a multi-objective optimization over schedule, cost, and quality. The proposed approach reformulates the tri-objective problem via a weighted-sum fitness

Authors

  • Xiao Liu

DOI:

https://doi.org/10.31449/inf.v49i25.10473

Downloads

Published

12/18/2025

How to Cite

Liu, X. (2025). Multi-Objective Optimization of Rail Construction Project Management Using Immune Genetic Algorithms for Schedule, Cost, and Quality Trade-offs. Informatica, 49(25). https://doi.org/10.31449/inf.v49i25.10473