Applying Mathematical Modeling Optimization Algorithms to Solve Shop Floor Scheduling Problems
Abstract
Shop floor scheduling is a key optimization problem in contemporary manufacturing, seeking to enhance production tasks and resources while increasing productivity and lowering costs. This paper solves the shop floor scheduling problem using an extensive mathematical model and an enhanced simulated annealing (SA) algorithm. The mathematical model captures intricate aspects such as machine allocation, job sequencing, batch transportation, and assembly procedures. To effectively solve the issue, the enhanced SA algorithm employs significant enhancement tactics like knowledgedriven initialization, a problem-specific neighborhood structure, and a restart mechanism to improve solution quality. The methodology is validated using an extensive experimental setup that investigates different situations with varying machine counts and job intricacies. Key findings show a 25% average decrease in makespan, a 20% rise in scheduling effectiveness, and a 15% reduction in computation time, demonstrating the algorithm's efficiency. These results highlight the theoretical and practical importance of this method in tackling real-world shop floor scheduling issues.DOI:
https://doi.org/10.31449/inf.v49i19.7113Downloads
Published
How to Cite
Issue
Section
License
Authors retain copyright in their work. By submitting to and publishing with Informatica, authors grant the publisher (Slovene Society Informatika) the non-exclusive right to publish, reproduce, and distribute the article and to identify itself as the original publisher.
All articles are published under the Creative Commons Attribution license CC BY 3.0. Under this license, others may share and adapt the work for any purpose, provided appropriate credit is given and changes (if any) are indicated.
Authors may deposit and share the submitted version, accepted manuscript, and published version, provided the original publication in Informatica is properly cited.