Abstract
In the process of road and bridge project cost prediction, factors such as material, labor, management and design can affect the prediction results. In order to accurately understand various influencing factors on the projects’ cost, a model using principal component regression and support vector machine is established. It uses principal component analysis to find the factors that have the greatest influence on the project cost prediction and to predict the cost of each factor to determine the magnitude of the influence of each major factor; meanwhile, the study compares the principal component regression-support vector machine model with the principal component regression model and the support vector machine-radial basis neural network model. The results of the study show that three models start to converge after about 120, 100 and 70 iterations, respectively, when the loss values are about 0.3, 0.25 and 0.16, respectively; the lowest R-squared of the three models for the five costs are 0.78, 0.75 and 0.87, respectively. It can be seen that the convergence and fit of principal component regression-support vector machine are better than those of the other two. Meanwhile, among the total costs, infrastructure costs, material costs, labor costs, equipment costs and management costs accounted for 5%, 63%, 13%, 12% and 7%, respectively; the material factor had the greatest impact on the total costs.DOI:
https://doi.org/10.31449/inf.v48i17.6370Downloads
Published
How to Cite
Issue
Section
License
Authors retain copyright in their work. By submitting to and publishing with Informatica, authors grant the publisher (Slovene Society Informatika) the non-exclusive right to publish, reproduce, and distribute the article and to identify itself as the original publisher.
All articles are published under the Creative Commons Attribution license CC BY 3.0. Under this license, others may share and adapt the work for any purpose, provided appropriate credit is given and changes (if any) are indicated.
Authors may deposit and share the submitted version, accepted manuscript, and published version, provided the original publication in Informatica is properly cited.