Peng, Lijuan, and Wanlu Li. “PSO-Optimized Grey-BPNN Hybrid Model for Predicting Construction Project Costs”. Informatica, vol. 49, no. 31, Aug. 2025, doi:10.31449/inf.v49i31.8947.