[1]
“Optimization of Elman Neural Network Using Genetic Algorithm for Construction Cost Estimation and Overspending Risk Analysis”, IJCAI, vol. 49, no. 12, Feb. 2025, doi: 10.31449/inf.v49i12.7592.