Yu, J. (2025) “Intelligent Construction Scheduling Based on MOEA/D-DE, SPEA2+SDE, and NSGA-III by Integrating Safety Assessment with Resource Efficiency”, Informatica, 49(11). doi: 10.31449/inf.v49i11.7147.