“Intelligent Construction Scheduling Based on MOEA/D-DE, SPEA2+SDE, and NSGA-III by Integrating Safety Assessment with Resource Efficiency” (2025) Informatica, 49(11). doi:10.31449/inf.v49i11.7147.