“Intelligent Construction Scheduling Based on MOEA D-DE, SPEA2+SDE, and NSGA-III by Integrating Safety Assessment With Resource Efficiency”. 2025. Informatica 49 (11). https://doi.org/10.31449/inf.v49i11.7147.