[1]
Yu, J. 2025. Intelligent Construction Scheduling Based on MOEA/D-DE, SPEA2+SDE, and NSGA-III by Integrating Safety Assessment with Resource Efficiency. Informatica. 49, 11 (Jan. 2025). DOI:https://doi.org/10.31449/inf.v49i11.7147.